Tamia J. Jones (Tammy) 101
County Road 312 Double
Springs, AL 35553 Mobile:
(205) 272-1253 Email: tammyjeanine1964@aol.com OBJECTIVE Apply a vast working knowledge of Project Control
techniques and skills to ensure the success of the project, the project team
and the customer. SUMMARY OF
QUALIFICATIONS · Over twenty years of experience in project controls · Project controls support provided on engineering, procurement and
construction (EPC), operations, operations and maintenance (O&M),
decontamination and decommissioning (D&D); and information technology
projects · Motivated self-starter requiring limited supervision · Ability to lead, mentor and manage to create a cohesive team · Excellent skills in cost development, maintenance and analysis · Excellent skills in schedule development, maintenance and analysis · Working knowledge and experience with the ANSI/EIA standards for
Earned Value (EVMS) reporting (748) PROFESSIONAL
EXPERIENCE
Project
Scheduler
Present – December 2013
Gilbert Consulting Services, LLC.
Supporting Duke Energy – Robinson Nuclear Plant,
Hartsville, SC Currently assigned to the Robinson Nuclear Plant
supporting the Fukushima Response Project. Specific duties consist of
development of a Work Breakdown Structure to support schedule
development. Development of schedules (Microsoft Project) to support
meeting the program requirements for successful implementation of the
Fukushima Response Project. Review and alignment of the supporting
contractor’s schedules (Primavera P6) with the Robinson project due dates.
Project Controls Consultant
November 2013 - June 2011
Universal Resources, Inc.
Supporting the Southern Companies – Southern
Nuclear Division, Birmingham, AL While assigned at Southern Nuclear supported the
Severe Accident Management (SAM) program to prepare and align the Fleet in
response to the Fukushima Response Guidelines. Specific duties
consisted of developing an overall Work Breakdown Structure for the SAM
program defined by Tier requirements; developing Primavera schedules (p6
schedules) covering the EPC efforts needed to address the Tier requirements
and incorporating those schedules into a SAM Primavera Enterprise
structure. Responsibilities consist of preparing
Engineering, Procurement and Construction (EPC) schedules for the Major
Projects division of Southern Nuclear for Cyber Security. Other key roles include working with the Fire
Protection organization to develop a schedule for submittal of the NFPA 805
submittal and implementation at the Farley plant; preparation of the schedule
containing pre-outage milestones and necessary Engineering tasks to support
upcoming outages; and working to prepare the associated schedules for several
Operational and Maintenance funded projects for the Fleet. Senior Project Controls Manager
November 2010 – June 2011 URS – Energy and Construction Supporting the Transition for the Babcock &
Wilcox Conversion Services, LLC in Oak Ridge, TN and Lexington, KY Responsibilities consisted of supporting
transition activities by developing a resource loaded schedule for transition
and completing associated Project Controls transition deliverables.
Those deliverables consisted of development of a Project Control Management
System, Project Baseline and the Risk Management Plan for the Depleted
Uranium Hexafluoride Conversion Project at Lexington, KY; Paducah, KY and
Portsmouth, OH. The Department of Energy agreed upon using a tailored
approach to the ANSI/EIA 748 standard for Earned Value Reporting in the
development of the scope, schedule and cost baseline. Additional duties
included managing a small project controls staff of five individuals and
establishing basic project control standards for reviewing and approving
purchase orders, establishment of the spend plan and standard reporting
practices. Project Controls Consultant
April 2009 – November 2010 SAA Solutions Inc. Savannah River Nuclear Solutions (SRNS), LLC –
Savannah River Site, South Carolina Responsibilities consisted of providing Fluor
with planning and schedule development support for the American Recovery
& Reinvestment Act (ARRA) projects. Specific duties included
leading schedule efforts for the construction of a waste remediation facility
and to provide daily schedule support for upgrades to an operational
facility. Project Controls Manager
December 2004 – March 2009 URS – Washington Division URS – EG&G Division Tennessee Valley Authority (TVA) Lagoon Creek
Combined Cycle Project – Brownsville, Tennessee Duties included leading and mentoring junior
project controls team members; maintaining the construction project schedule
and budgets; performing cost and schedule analysis, trending and reporting. Washington Demilitarization Company, LLC - Pine
Bluff Chemical Demilitarization Facility – Pine Bluff, Arkansas Responsibilities included leading and managing
the project controls organization, with significant emphasis on creating a
unified team and growing project control’s skills. Development of new
and enhancement of existing project control’s tools to better support the
project team. Maintaining and training project team members on the use of a validated
Earned Value Management System. Additional duties included performing
cost and schedule trends and analysis in support of the operations and
maintenance of the facility; and developing, reviewing and analyzing cost and
schedule data for proposed construction modifications during plant
outages. Senior Project Scheduler/Analyst
April 2003 – November 2004 SAA Solutions, Inc. Fluor - Silos Project at Department of
Energy Fernald Site – Cincinnati, Ohio Responsibilities included providing schedule and
cost support for the mechanical (DeBra-Kuempel) and electrical (Lake Erie
Electrical) contractors constructing the facilities for remediation of the
Silos waste. Duties included resource loading the schedules, tracking
actual costs for the two subcontractors and providing Fluor with a forecast
to complete each month for the two subcontractors. Project Control Manager
April 2002 – April 2003 CH2M Hill Mound Inc. D&D of the Main Hill Facilities at Department
of Energy Mound Site – Dayton, Ohio Specific duties included schedule development,
resource modeling, scope management, EVMS reporting, variance analysis and
project control procedure development and supervision of Project Control
Analysts. Additionally, extensive schedule reviews were performed on
subcontractor schedules for compliance with reporting requirements, critical
path analysis and risk evaluations. Project Controls Consultant
April 2001 – April 2002 Informatics Corporation, Inc. Fluor – Project Controls Oversite Support -
Department of Energy Fernald Site – Cincinnati, Ohio Responsibilities included providing scheduling
support for the creation and generation of a master/subproject schedule for
the site. The goal of the schedule was to establish the baseline for
the completion of the project. Upon completion of the baseline schedule,
routine updates and analysis was performed comparing the current project
status versus the baseline. Project Control Manager
July 1999 – April 2001 BWXTO Inc. D&D of the Main Hill Facilities at Department
of Energy Mound Site – Dayton, Ohio Responsibilities included schedule development
through interactive planning sessions, resource modeling, scope management,
EVMS reporting, variance analysis, project control procedure development and
leading, managing a group of Project Control Analysts. Project Controls Consultant
May 1999 – September 1999 Self-employed Boston College – Boston, Massachusetts Responsibilities included preparing a schedule
for a study team at Boston College researching the changing missions at
Department of Energy sites for the National Institute for Occupational Safety
and Health (NIOSH). Duties also included routine tracking and progress
reporting.
Senior Scheduler/Cost Analyst
June 1998 – June 1999 Jacobs Engineering Group Inc. Massachusetts Military Reservation – Cape Cod,
Massachusetts Responsibilities included creating
master/subproject schedules to track construction efforts and operations-
remedial work efforts on various cost plus and firm fixed price contract
efforts. Other duties included maintaining resource loaded schedules,
tracking budgets versus actual costs, analyzing costs and schedules and
preparing estimates to complete reports for review with management. Senior Consultant
March 1998 – May 1999 Hutton & Associates Inc. USAA – San Antonio, Texas Provided support for the development of a Project
Control Division office for a business unit within USAA. Specifically,
writing and establishment of procedures and guidelines for performing project
control functions and detail development of coding structures to be utilized
for schedules. Senior Consultant
July 1996 – March 1998 Booz-Allen & Hamilton Inc. Air Force Center for Environmental Excellence
(AFCEE) – Brooks Air Force Base, San Antonio, Texas Responsible for performing independent reviews of
various contractors project control reports and providing analysis and
feedback to the Air Force Center for Environmental Excellence (AFCEE) on the
cost and schedule performance of the contractors. Other duties included
working with AFCEE to prepare a schedule capturing all the remedial work to
be performed at the Massachusetts Military Reservation. Also, was
tasked with preparing the Project Control section of the Program Management
Plan which is used as the guide for doing business at the base. Project Scheduler
July 1995 – July 1996 Caddell Construction Company, Inc. Federal Bureau of Prisons (FBOP) – Edgefield,
South Carolina Duties included the development and maintenance
of the Primavera schedule for tracking construction progress on a medium
security prison. Additional duties included performing day-to-day
coordination with the subcontractor’s on the project and prepared the monthly
progress payment. Project Control Analyst
April 1993 – July 1995 International Technology Corporation Wright Patterson Air Force Base - Dayton, Ohio EG&G Mound – Department of Energy – Mound
Site – Dayton, Ohio Duties consisted of performing initial job
set-up, work breakdown structure development, budget/resource and schedule
development. Routine progress was performed on the schedules and detail
analysis was performed on the cost for forecasting future project
costs. Senior Planner & Cost Analyst
January 1990 - April 1993 Theta Technologies Inc. Westinghouse – Department of Energy – Fernald
Site – Cincinnati, Ohio Department of Energy – Piketon Site – Piketon,
Ohio Responsibilities included developing resource
loaded schedules and tracking progress against the Critical Path Method
schedules for completing construction efforts at the Department of Energy
Fernald site and performing scheduling efforts for projects at the Department
of Energy Piketon site. Project Coordinator
December 1987 - January 1990 Mitchell Brothers Contractors Inc. - Birmingham,
Alabama Duties included preparation of cost estimates and
bid packages for construction of light commercial construction projects and
custom homes. Other duties consisted of preparing schedules, tracking
progress against the schedules and tracking budgets for completion. CAREER
HIGHLIGHTS December 2004 – March 2009 – URS/Washington Group
International · Selected to participate in the Leader’s Forum training provided by the
Office of the Chair for Washington Group International · Selected to participate in the Talent Development Program for two
years · Lead the Project Controls team to a successful implementation of a new
baseline and a “No Findings Integrated Baseline Review” by the Department of
Defense – Army Chemical Demilitarization Program · Selected to participate on the team that developed an Accelerated
Project Controls Leadership Program · Recipient of a Washington Group International Lion’s Award for
Excellence · Lead the Project Control team that developed a new Estimate at
Completion (EAC) tool. The tool was recognized by the company’s Project
Review Board as a “Best Practice”. April 2001 – April 2002 Informatics Corporation · Lead the efforts to create an integrated baseline schedule capturing
the work scope to be performed at the Department of Energy – Fernald
site. This provided a critical path and end date for the program. June 1998 – June 1999 Jacobs Engineering Group · Worked closely with Senior Jacobs Management to develop resource
models and schedule models for all remediation work at the Massachusetts
Military Reservation. The integrated schedule and resource loaded
histograms were presented in meetings with the Air Force Center for
Excellence (AFCEE). July 1996 – March 1998 Booz-Allen & Hamilton,
Inc. · Prepared the Project Controls sections of the Program Management Plan
for the Massachusetts Military Reservation and conducted the training
associated with the plan. April 1993 – July 1995 International Technology
Corporation · Recipient of a International Technology Quality Award SOFTWARE
EXPERIENCE Primavera (P6), Primavera Project Planner (P3),
Primavera SureTrak, Pertmaster, Winsight, Prism, Cobra, Microframe Project
Manager (MPM), Microsoft Project, Word, Excel, Powerpoint EDUCATION 1987 Auburn University, Auburn, Alabama; Bachelor
of Science – Building Science |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|